The print service lives on
/api/v1/print/, not under /api/v2/data/ like
the rest of this reference. It authenticates with the same access token.1. Request the report
Post the tickets (or audits) you want in the report, together with thecallbackUrl you want the result delivered to.
The requesting user is taken from the access token and printed on the report;
a
user field in the body is ignored.
To print, the authenticated user must hold a role on the project — accountable,
support, responsible, consulted, informed or reporter — or be an administrator
or manager on the contract. Anyone else gets 401.
An audit report is the same call with audits and auditPrint:
2. Receive the callback
When rendering finishes, the print service sends aPOST to your
callbackUrl with the download link:
- It is a plain unauthenticated POST. Nothing in the request identifies Ed Controls, so use an unguessable callback path and treat the call as untrusted until you have matched it to a job you submitted.
- Delivery is single-attempt and best effort. There is no retry and no backoff. If your endpoint is down, times out (30 seconds), or returns an error, the link is lost and the report has to be requested again.
fileNameis server-generated, derived from the project name and a timestamp — it is not thefilenameyou submitted. Do not rely on its shape.- Rendering typically takes one to two minutes; large reports take longer.
3. Download the PDF
filePath is a direct link to the rendered PDF:
What the report contains
Reports requested through the API use a fixed, compact layout so that output stays stable for integrations. Layout options sent inprintoptions are
ignored — the preset is applied instead.
A ticket report contains a cover sheet, and per ticket: the description, start
and due date, one image, the location on the drawing, and the timeline
including comments. Consulted/informed participants, the responsible user and
file attachments are left out.
An audit report contains a cover sheet, the audit questions and answers
including those answered N/A, due date, responsible, attachments, informed
participants, and the tickets raised from the audit.
